Currently, many rural areas lack the infrastructure to transmit power to urban areas during peak production times (when there is surplus electricity created). Solutionary Rail envisions using the pre-existing ROW for transmission lines, both to power the trains and also to avoid procurement of new ROW for such infrastructure. The excess renewable energy of these areas can be the next cash crops for them.